Accutech Engineering Inc. was retained by Achieve Engineering to provide design & project management services relating to the development of a new weatherproof loadout shelter for Husky Energy’s Ethanol Plant in Lloydminster, Saskatchewan.
The new shelter building included:
- Concrete grade beam on helical pile foundation
- Slab on grade
- Steel frame shell building
- Incorporate intermediate translucent roof panels
- New control room
- Ventilation system
- Site drainage system
- Demolition of existing control room
- Modifications to existing surrounding structure to accommodate the new shelter
- Loadout remain operational throughout construction of the shelter